SCHAUFF ... seit 1932 Wässerscheid

revised 04.21.99js

Zeppelinstrasse
Index

page back


Stammwerk

pic.: the production site since May 1968.

building In der Waesserscheid 56

With the booming export of bikes to the USA the builing erected after the war grew too small so that the production was moved to a new site close to the railways.

This building is still housing the painting plant, the wheelbuilding, the assembly lines, shipping, the offices for sales and customer service.

pic.: painting plant for high-solid wet paint and powder coating

Lackierung

The painting plant consists of a fully automated 4 cabin electrostatic wet paint section and a semi-automated powder coating section. After a lot of R&D Schauff can produce frames with colorful wet paint with a final application of shiny or flat clear powder coating.

pic.: wheelbuiling
Einspeichroboter Setzroboter Zentrierroboter
spoke insertion spoke tightening wheel trueing

The wheels are being laced with Holland Mechanic machines. Before final truing the wheels are pre-set with a special robot, so that the break-in loss of tension during the first 100 km is reducud to about 30%.

pic.: frame assembly
frame aligment BB-unit robot
CNC frame aligment Bottom bracket cutting and insertion

After painting all frames are aligned to a few 1/10 of a mm by 3 CNC robots. The bottom bracket threadings are cut by robot which is unique in the bicycle industry. The same robot also assembles the cartridge type BB-units.

Later on the bicycles are assembled by hand and after final inspection all bikes are "mated" with their specifications list and the serial numbers of their frames in the Schauff computer system. This enables Schauff to track all bikes from the production to the customer and helps to find the right sparepart for this particular bike, if the need arises.

pic.: shipping
Barcode Versand per Bahn
barcoded shipping label delivery of bikes by railway


Any questions?  Please write us! SCHAUFF@AOL.COM
top | page back